A380 Production Update: December 2009 (#5)

Posted by Oliver Gigacz
Dec 05 2009

Finally the second A380 for Lufthansa has rolled out of the Final Assembly Line and is now parked in position A19.  MSN041 took 33 weeks from Convoy to Roll Out. Four weeks longer then MSN038 (Lufthansa #1). Picture is to come shortley.

You must be logged in to post a comment.

Trackback URL for this entry