MSN057 (Emirates #15) has finished it’s first part of Final Assembly which included having The flaps installed, Some Belly Fairing, the APU and many “Under the Hood” parts.
MSN057 is currently sitting on the flightline waiting to switch spaces with MSN048 (Lufthansa #4). MSN048 should be rolled out of the Final Assembly Line late this week.
The final parts for MSN057 arrived in Toulouse on the 12th November and has only taken 92 days to get to this stage. This is a dramatic increase in time for Body Join and the first stages of Final Assembly.
This also means the production in Toulouse is speeding up but over in Hamburg, Outfitting is staying very much the same.
We expect by late April that MSN042 (Emirates), MSN047 (Qantas), MSN050 (Qantas), MSN052 (Air France) and possibly MSN056 (Emirates) to be completed.
But at the same time all the Outfitting slots in Hamburg will be already be occupied by…
MSN030 (Emirates), MSN041 (Lufthansa), MSN044 (Lufthansa), MSN046 (Emirates) MSN048 (Lufthansa) and MSN049 (Air France).
This means that Outfitting must be dramatically increased to get the twenty odd scheduled A380s for 2010 delivery to actually being delivered this year.